Hi Russ
I'm part of the Extended team, and so have been fiddling with the bus for quite a while.
We have a strict nondisclosure clause, so I can't be saying too much, but from what I've been seeing, this is going to be one for the history books. The level of detail (either implemented already or planned) is amazing. All the Arinc legs are planned, full (and I mean FULL) FBW, all systems fully modeled... Abnormal checklists on the ECAM... the whole lot.
I can't be sure how long it is still going to take to reach full fruition, but let me tell you, this is the real thing... or as close as anyone can get without putting their bedroom on hydraulic jacks.
Eric
sorry for the ranting and raving, but this time I think it is deserved